Home / Component / CPU / Intel details ‘Clearwater Forest’ Xeon CPUs at Hot Chips 2025

Intel details ‘Clearwater Forest’ Xeon CPUs at Hot Chips 2025

Intel has taken the stage at the Hot Chips 2025 to lift the curtain on Clearwater Forest, its next-generation E-core Xeon processor and the successor to Sierra Forest. The new data center chip is an absolute monster, packing up to 288 cores per socket and serving as a showcase for Intel's most advanced manufacturing and 3D packaging technologies.

According to Wccftech, in its largest configuration, the Clearwater Forest processor is a complex sandwich of multiple chiplets built on three different process nodes. It features twelve compute chiplets fabricated on Intel's 18A process, which are then stacked on top of three base tiles built on the Intel 3 process using Foveros Direct 3D packaging. These are then connected via EMIB to two I/O tiles built on the mature Intel 7 node.

Image credit: Wccftech

Powering the chip are the new “Darkmont” E-cores, which feature significant architectural upgrades over the “Crestmont” cores found in Sierra Forest. Intel has detailed a wider front-end with an extended decoder and a larger instruction cache, paired with a more robust out-of-order engine and more execution resources. In simple terms, this means each core can handle significantly more instructions in parallel, boosting throughput and overall performance.

Intel also confirmed that Clearwater Forest will be compatible with the existing Xeon 69xxE/P platform, allowing for a drop-in upgrade path from Sierra Forest and Granite Rapids. While the platform maintains its 12 channels of memory, the supported speed is increasing, with Clearwater Forest set to utilise faster DDR5-8000 memory. The new processors are expected to be shipped starting in 2026.

Discuss on our Facebook page, HERE.

KitGuru says: Do you think Intel's new Xeon chips will have what it takes to take the performance crown from AMD's EPYC chips? 

Become a Patron!

Check Also

Call of Duty COD

KitGuru Games: Predicting the Next Half a Decade of Call of Duty Releases

Benjamin Franklin (1706-1790) famously once said: “The three absolutes in life are death, taxes and a new Call of Duty coming out every single year”. Sure enough, the US founding father has yet to be proven wrong, with Activision and a dozen studios having ensured that come the tail-end of any given year, there will be a new COD ready to release. And so, what can we expect from the franchise later this year? What about 2027, 2028 or even 2030? By looking back at the past two decades of Call of Duty games, their trends, progression and regression, I believe I can predict the next 5 years worth of annual COD entries.